Legal Header

Directive 036: Drilling Blowout Prevention Requirements and Procedures

View PDF
(3.16 MB)

Release Date: March 14, 2019

Effective Date: March 14, 2019
Replaces the previous edition released on January 31, 2018.
Released with Bulletin 2019-06.

 

Purpose of this Directive

This directive details the minimum equipment and procedure requirements that the licensee must follow when drilling wells in Alberta. It also describes the role of AER field centre inspectors and includes and explains the AER Drilling Inspection Report, which AER field inspectors complete during site inspections. Inspectors can also use this directive as a reference when completing inspection reports.